Case studies

Real projects, real numbers

Our clients asked to remain anonymous, so we describe the projects without names. The figures are real.

Sport · Romania

4 panoramic padel courts in one 40’HQ container

4 courtsoutdoor, panoramic
11,070 €+ VAT per court, delivered*
1 × 40’HQall courts in one container

The challenge

An operator of four sports centres wanted complete padel courts at a better total cost than on the local market, without the risk of dealing with an unknown factory and without spending time on the import.

What we did

  • Selected a factory whose courts meet national padel federation standards and that also offers roofing options
  • Negotiated a complete package: structure, tempered glass, artificial turf and lighting. The client only had to install
  • Optimised loading so all 4 courts fitted into one 40’HQ container, reducing freight per court
  • Handled shipping, customs and delivery, and attended the unloading with the client

Result

3 weeks of preparation, 55 days at sea and 4 days to delivery. No issues, exactly to plan, and a very satisfied client.

* Price level at the time of the project. Current prices depend on configuration, quantity and freight.

See padel courts

Padel court

Planning padel courts?

The more courts you order together, the lower the cost per court, because freight is shared. We help you choose panoramic or standard, indoor or outdoor, with or without roofing.

Ask about padel courts

Hospitality · Romania

A new 8-room hotel furnished from 2 factories

2 factoriesfurniture + sanitary ware
11,000 USDFOB value, 30 m³
1 × 20′everything in one container

The challenge

A new hotel in Oradea needed beds, wardrobes, all other furniture and the sanitary ware in one consistent style. The difficulty was not technical, it was taste: the client wanted to choose every piece.

What we did

  • Presented several models from several factories until the style was right; part of the pieces were custom-made
  • Coordinated two factories so that everything was ready at the same time
  • Planned the loading so that 30 m³ fitted into one 20′ container
  • Organised shipping, customs and delivery to the hotel

Result

3 weeks of preparation, 55 days at sea (with the Red Sea closed, vessels sailed around Africa) and 4 days to the client’s door.

Hotel room

Furnishing a large project?

Hotels, care homes, event venues, schools: the hard part is not finding one supplier, but coordinating all of them into one shipment.

Discuss your project

See more on video

Unloading, factories and the Canton Fair on our TikTok and YouTube channels.

Watch on TikTok